Mk19- Deuturium Fission Self Regulating Reactor
Comments
-
tuned thermal visual gauge to 700-800c
-
wiring fixes to shutdown and recheck system
-
reinforced several more thermal weak points
-
improved temperature probe lead; fixed spark multiplication issue caused by split lead by the rapid response visual gauge
-
improved visual gauge heat exhaust; reinforced potential failure point
-
connected aux fuel valve to non emergency shutdown button
-
tuned up wiring on shutdown leads i/o
-
MAJOR BUG FIX; Fixed flow reversal in the fuel injector during emergeny shutoff. emergency shutoff no longer destroys injector