GottaLoveFlying
GottaLoveFlying
2 / 0
19th August
10:03:01
currently still a prototype, very much a work in progress
reactor

Comments

  • GottaLoveFlying
    GottaLoveFlying
    10:01:25
    tho idk if i want less margin considering i alr lowered it from 30 seconds
  • GottaLoveFlying
    GottaLoveFlying
    10:01:05
    GDCS currently arms 10 seconds after a low low level but i could make it 8 and have it still not spuriously actuate on a LOFW
  • GottaLoveFlying
    GottaLoveFlying
    5:39:55
    i really want to add isolation condensers in but the GDCS makes it redundant
  • GottaLoveFlying
    GottaLoveFlying
    19th August
    in this BWR i have merged the function of the ADS and IC (isolation condenser) all into the GDCS as well as merging the GDCS into the wetwell
  • GottaLoveFlying
    GottaLoveFlying
    19th August
    stated previous CBWR id:3392326
  • GottaLoveFlying
    GottaLoveFlying
    19th August
    squib valves irl are explosive valves that detonates an explosive to open and are normally super reliable (with occasional testing of the electrical leads used for detonation, note u cant test the explosive itself as once it explodes, its gone)
  • GottaLoveFlying
    GottaLoveFlying
    19th August
    ADS - automatic depressurization system, GDCS - gravity driven cooling system, ESBWR - economic simplified boiling water reactor, IC - isolation condenser, tho also a mode of the GDCS in my reactor (called isolation cooling instead)
  • pinos_mrime
    pinos_mrime
    19th August
    im kind of too stupid to understand all of these words can i ask what they mean