currently still a prototype, very much a work in progress
reactor
Comments
-
tho idk if i want less margin considering i alr lowered it from 30 seconds
-
GDCS currently arms 10 seconds after a low low level but i could make it 8 and have it still not spuriously actuate on a LOFW
-
i really want to add isolation condensers in but the GDCS makes it redundant
-
in this BWR i have merged the function of the ADS and IC (isolation condenser) all into the GDCS as well as merging the GDCS into the wetwell
-
stated previous CBWR id:3392326
-
squib valves irl are explosive valves that detonates an explosive to open and are normally super reliable (with occasional testing of the electrical leads used for detonation, note u cant test the explosive itself as once it explodes, its gone)
-
ADS - automatic depressurization system, GDCS - gravity driven cooling system, ESBWR - economic simplified boiling water reactor, IC - isolation condenser, tho also a mode of the GDCS in my reactor (called isolation cooling instead)
-
im kind of too stupid to understand all of these words can i ask what they mean