Boiling Water Reactor (BWR). Startup: disable RHR, withdraw rods, enable RCP, FWP, CND, CCP, HPFH, disable DA BY. On steam generation, enable TB IN and disable TB BY. Makeup as needed. Shutdown: enable RHR, disable RCP, SCRAM. Emergency: LPCI, RCIC, SLC		
				
			
							nuclear
							reactor
							boiling
							realistic
							steam
							turbine
							generator
					
	 
	
	
	
	Comments
		
				- 
			
			
I'm not entirely sure what a NNN switch is in the context of a GE BWR reactor! Could you explain?
		 
		- 
			
			
its a good idea trust
		 
		- 
			
			
Emergency NNN switch
		 
		- 
			
			
there is no way im remembering all those instructions haha
		 
		- 
			
			
Ah, acronyms, the bread and butter of all nuclear engineers. +1