Boiling Water Reactor (BWR). Startup: disable RHR, withdraw rods, enable RCP, FWP, CND, CCP, HPFH, disable DA BY. On steam generation, enable TB IN and disable TB BY. Makeup as needed. Shutdown: enable RHR, disable RCP, SCRAM. Emergency: LPCI, RCIC, SLC
nuclear
reactor
boiling
realistic
steam
turbine
generator
Comments
-
Emergency NNN switch
-
there is no way im remembering all those instructions haha
-
Ah, acronyms, the bread and butter of all nuclear engineers. +1