spikevipertwin
spikevipertwin
1 / 0
20th Jan 2024
20th Jan 2024
spark the pscn to turn on the switch on. spark the nscn to turn off the switch. you will have to wait for the forge to heat up before putting in any meltable metal. then wait for auto cooling. spark the second pscn to get a little heat boost

Comments

  • spikevipertwin
    spikevipertwin
    20th Jan 2024
    feel free to comment what you have to say about this