hermankronfeld
hermankronfeld
259 / 20
20th Jun 2014
20th Jun 2014
temperatur controlled deuterium reaktor with deuterium factory. with auto on/off for reaktor and deuterium factory, here i have declared how to swith on the reaktor and deuterium factory.
reactor complex nuclear smart electronics water confusing deutrium deut turnitallon

Comments

  • liamengland
    liamengland
    20th Dec 2016
    way to complicated
  • tansrope
    tansrope
    17th Jun 2016
    i really like your heads up display. really cool design. good job! +1
  • P1u5hieF0xy
    P1u5hieF0xy
    28th Apr 2016
    10\10 ^_^
  • KungZacharias
    KungZacharias
    7th Jun 2015
    have you runed it yet SuperjoshiDuff
  • SuperJoshiDuff
    SuperJoshiDuff
    3rd May 2015
    Im going to run this overnight and see what happens.
  • sebacalka
    sebacalka
    28th Nov 2014
    Good job
  • sebacalka
    sebacalka
    28th Nov 2014
    Is fellows in the control room are bare above the waist? LOL LOL
  • 1stmythbusterfan
    1stmythbusterfan
    1st Jul 2014
    drop a single pixel of nuet in the pipe leading 2 where the deut izzz lol
  • GoldRokstar
    GoldRokstar
    27th Jun 2014
    for logo go here 1571517
  • GoldRokstar
    GoldRokstar
    27th Jun 2014
    If you need a custom logo search my name