longinuspun
longinuspun
2 / 0
18th Dec 2012
2nd Feb 2013
Messing with tmp, which changes the size of the lightning for different parts of the tesc. The timing and changeing the tmp for specific parts took the longest.

Comments

  • longinuspun
    longinuspun
    2nd Feb 2013
    a tmp of 1000 doesn't have much ligh, but it is large. It shows the ligh occasionally
  • bimmo_devices
    bimmo_devices
    21st Dec 2012
    Not bad. You should make a line of 1000 tmp! (I didn't no about this tmp thing)
  • longinuspun
    longinuspun
    18th Dec 2012
    The timing took a while