A boiling water reactor, designed to handle DBAs for at least 10 minutes without operator action | Give it a couple minutes to stabilize after loading in | Purely function over form | Will be updated if needed
reactor
nuclear
uranium
uran
Comments
-
i would add L8 seal in for stopping the main turbine ,feed turbines, RCIC, and HPCS
-
srry nvm it does work correctly
-
shouldnt RPS trip from either A1/2 or B1/2 logic tripping from one out of two taken twice logic?
-
very nice
-
GottaLoveFlying: yeah its my fault for calling you out im sorry
-
yea i wanted to change the name of it slightly and delete most of my comments
-
reupload btw
-
My brain is exploding
-
HOW DID YOU MAKE THIS
-
um woahh