GottaLoveFlying
GottaLoveFlying
25 / 2
27th June
4:45:24
A boiling water reactor, designed to handle DBAs for at least 10 minutes without operator action and most BDBEs for at least 2 minutes | RPS, circ water, AFW, RCIC unfinished, LOGIC IS A PAIN
reactor logic boiling water uranium nuclear uran

Comments

  • GottaLoveFlying
    GottaLoveFlying
    8th August
    nvm div 3 is now having spurious low level acutations
  • GottaLoveFlying
    GottaLoveFlying
    8th August
    made division 3 ESF have separate actuation signals for better reliability
  • pinos_mrime
    pinos_mrime
    8th August
    Cool circuits that i will never ever understand in my life
  • GottaLoveFlying
    GottaLoveFlying
    7th August
    i swear dont look at the RMCS with decor off
  • KyleTheCreator
    KyleTheCreator
    7th August
    { 0 . 0 }
  • GottaLoveFlying
    GottaLoveFlying
    7th August
    u can select all 4 rods at once bu sparking all 4 buttons at once (paused game) if u dont wanna wait too long
  • GottaLoveFlying
    GottaLoveFlying
    7th August
    added a small deminiralizer to help protect against contaminants entering the CST
  • GottaLoveFlying
    GottaLoveFlying
    7th August
    nest goal is either to finish div 1 2 and 3 ESF or RPS
  • GottaLoveFlying
    GottaLoveFlying
    7th August
    RMCS should now be in a functional state tho missing rod drift, accumulator stuff and rod blocks
  • GottaLoveFlying
    GottaLoveFlying
    6th August
    noooooooooooooooooooooooooooooooooooooo