GottaLoveFlying
GottaLoveFlying
45 / 3
27th June
15:49:19
A boiling water reactor, designed to handle DBAs for at least 10 minutes without operator action | Give it a couple minutes to stabilize after loading in | Purely function over form | Some upgrades are coming in the future
complex reactor logic boiling water uranium nuclear uran

Comments

  • Ziheng
    Ziheng
    25th September
    This nuclear reactor/power plant is better than mine!So cool!
  • GottaLoveFlying
    GottaLoveFlying
    25th September
    oh hi there
  • iamzach
    iamzach
    25th September
    holy cow stop spamming comments +1
  • GottaLoveFlying
    GottaLoveFlying
    25th September
    rcic needs to not suck xd
  • GottaLoveFlying
    GottaLoveFlying
    25th September
    5 month long project nearing the end xd
  • GottaLoveFlying
    GottaLoveFlying
    23rd September
    trying to work out a containment vent system
  • GottaLoveFlying
    GottaLoveFlying
    22nd September
    actually ima keep both but just make high temperature scram take a lot longer
  • GottaLoveFlying
    GottaLoveFlying
    22nd September
    i might swap out the extended high temperature scram to just relief valve actuation scram
  • GottaLoveFlying
    GottaLoveFlying
    12th September
    prob will add relief valve controls soon
  • GottaLoveFlying
    GottaLoveFlying
    12th September
    increased relief valve capacity for an atws