resic
23rd Nov 2024
13th Dec 2024
This reactor uses plut as efficiently as possible by using molten plut. It can withstand the huge amount of heat molten plut produces and control it to boil water and create electricity. Project under construction
reactor
building
complex
someuniquetag
Comments
-
I expected that people won't understand the instructions very good. Please read them carefully and if it doesn't work, try another way.
-
I was wrong to assume that of course
-
Yes, i read that, i just assumed with the portal there, it would also eject the stone at some point, or that i had done something wrong and allowed it to cool below 900C and 'stalled' it
-
"Auto only controls heat"
-
Ah, okay i just thought that it would automatically cycle and renew.
-
nobodyagain: I think you're using it incorrectly. When the tmp of the molten plut reaches 0 it won't create any heat anymore: you have to renew it. When the whole system reaches a high temperature, the plut won't even convert to stne and you have to hold that temperature by constantly renewing the plut.
-
The only issue with that is the reactor constantly stalls, the automatic system cannot pull out the coolant before the lava turns into stone, and its worse trying it by hand.
-
nobodyagain: yeah, I know that problem. To minimize the probability of that you should run the reactor at lower temperatures, but it still could happen.
-
The only problem i have found is the wate-pipe instantly nuking the reactor, unless its just to clear out the core before refuel, i would suggest a timer for each activation period.
-
ok, that was my quickest fp in my life lol