Jerehmia
Jerehmia
133 / 1
23rd Nov 2023
28th Nov 2023
The complex was established in 2291 to serve the X Terraforming Co. mining concession in Argyre Planitia. It was restructured and fully automated shortly after the Martian Demusking of 2357 and the abolition of human dronery.
electronic factory auto satisfaction fpga60 subframe electronics fpga power crane

Comments

  • Jerehmia
    Jerehmia
    23rd Nov 2023
    Caveats: 1) The water in the heat exchanger freezes sometimes, fixing this would complicate the generator design a lot. 2) The coal bunker could in theory run empty if the crane is too busy loading the train or if not enough COAL is spawned, this didn't happen in 2 days of testing.