The complex was established in 2291 to serve the X Terraforming Co. mining concession in Argyre Planitia. It was restructured and fully automated shortly after the Martian Demusking of 2357 and the abolition of human dronery.
electronic
factory
auto
satisfaction
fpga60
subframe
electronics
fpga
power
crane
Comments
-
Caveats: 1) The water in the heat exchanger freezes sometimes, fixing this would complicate the generator design a lot. 2) The coal bunker could in theory run empty if the crane is too busy loading the train or if not enough COAL is spawned, this didn't happen in 2 days of testing.