makike
28th Apr 2020
2nd May 2020
nuclear power plant . auto power
plant
energy
pwr0
automatic
woahwow
Comments
-
I've paid so many respects...
-
Something interesting: You need to wait about 4180 frames after sprking "on", and before 155 :D (120 will be somewheare on 2160 frames). And nope, i'm not bored, i'm just strange :|
-
i dont uder stand :/ +1 it looks complex
-
Cool +1
-
awesome +1
-
i realised what the issue might be: your WIFI seems to be back-communicating, fixed by putting one pixel of air between the PSCN-TTAN connection points
-
+1! always awesome to see this design get updated, good job on automation. small bug i found, rod 1 is stuck on due to a small feedback loop in its control circuit. erasing and replacing the titanium wire in the lower rightmost leg fixed it