Nuculus
12th Mar 2019
20th Nov 2019
The console command stops the polonium from melting. You can use the sign element to select it, then copy and enter it into the console. The turbine require heat and pressure to work. Click water coolant to fill up water and click neutron beam to start
electricity
fission
pressurized
nuclear
reactor
requiresconsole
neutron
realistic
polonium
tnpp
Comments
-
i love this
-
I can see the headlines now! "Moron Power Plant Director Inserts control rods too fast, reactor meltdown ensues "
-
nice+1
-
read desc
-
what does the important command????
-
deuterium undergoes fusion not fisson. this is one of the things tpt got wrong, deuterium in real life is nothing like in tpt.
-
it was the command so its fixed now but what is still a problem is the back pipes the pipes that return the water to the boiler breaks if it runs for a long time
-
its pretty cool but not all of the water get boiled thanks to powders toy bad physics and the uranium doesnt last long when you take out all of the rods
-
Im so god damn tired of water going in the god damn turbine!
-
you're welcome