Dizzardzeal
Dizzardzeal
1 / 0
3rd Oct 2014
3rd Oct 2014
H ion, Tempurature, Pressure, and Pressure vent controls. Operation: Add H ions to test chamber. Press green control or use manual switches. Observe reaction. Stop reaction with red switch. Drain chamber pressure with buttons beneath pressure switch.

Comments